469-721-0196
Get a numberCall 469-721-0196

Metal buildings
in Mount Pleasant

Commercial, industrial and residential metal buildings in Mount Pleasant and Titus County. 1 hour 50 minutes from Royse City.

Building here

What Mount Pleasant is like to build in

Interstate 30 and US 271 carry the industrial base, and poultry processing is the dominant industry. Lake Bob Sandlin is the recreational side. Buildings tied to a poultry operation carry ventilation and wash-down requirements a plain shop does not.

Permitting

City of Mount Pleasant. Titus County outside. Interstate 30 frontage brings TxDOT into access and driveway permitting on commercial sites.

What the ground does

Sandy loam over clay. Poultry and ag operations are common, and those buildings carry ventilation and wash-down requirements a plain shop does not.

Commercial pricing

Includes engineered frame, roof and wall panels, slab and foundation, doors, erection, permits and basic site grading. Dried in and usable.
Building sizePer SF
1,500 - 2,999 SF$52 - $68
3,000 - 4,999 SF$46 - $58
5,000 - 9,999 SF$38 - $50
10,000 - 19,999 SF$32 - $42
20,000 SF and up$27 - $36

Barndominium pricing

Living area only. Finish level drives the number, not size.
Finish levelWhat it isPer SF
Shell, dried inSlab, frame, roof, wall panels, windows, exterior doors. No interior.$62 - $78
Basic finishSpray foam, HVAC, standard cabinets, LVP flooring, builder-grade fixtures.$118 - $138
Mid finishQuality cabinets, mixed flooring, upgraded fixtures and trim.$145 - $172
High finishCustom cabinets, stone counters, premium fixtures, custom features.$185 - $225

Under 2,500 SF, add 10 percent. Fixed costs do not shrink with the house. Attached shop or garage space runs $48 - $62 per SF.

Full breakdown on the pricing page.

Is this a fit

We're probably not your builder if

  • You need a repair or a service call.
  • You're looking at a shed, a carport, or a kit.
  • You want the steel dropped and nothing else.

We're a fit if

  • You're building 1,500 SF or more of finished commercial or industrial space.
  • You're building a 2,000 SF or larger home on your land.
  • You want one contractor from slab to final finish.

Before you call anyone

Guide

Metal building cost in Texas

What a metal building actually costs in Texas in 2026, by size and by scope, with the site costs nobody puts in the brochure number.

Guide

Metal building permits in Texas

Who issues the permit, what a Texas jurisdiction actually wants to see, what changes outside city limits, and what the whole process costs in time.

Guide

What a slab actually costs

Foundation cost per square foot in Texas by loading, why Blackland clay changes the design, and why leaving the slab out of a quote makes it look cheap.

Common questions

Who issues the building permit in Mount Pleasant?
City of Mount Pleasant. Titus County outside. Interstate 30 frontage brings TxDOT into access and driveway permitting on commercial sites.
What is the soil like in Titus County and how does it affect the slab?
Sandy loam over clay. Poultry and ag operations are common, and those buildings carry ventilation and wash-down requirements a plain shop does not.
Do you actually build in Mount Pleasant?
Yes. 1 hour 50 minutes from Royse City. We take commercial, industrial and residential metal buildings in Mount Pleasant and across Titus County.

Get a number

Building in Mount Pleasant?

Or call 469-721-0196.